What’s New on Insights: Match Robot KPIs with your Work Shifts – Info Robotic

Align your robot's production with your whole production schedule to get more accurate KPIs.
Now you can set KPIs based on work shifts, and measure production when the work actually takes place—rather than by full calendar days.


KPIs for a “full day” (top) vs. custom operating hours (bottom).
After you input the robot's work times, Insights will automatically track the robot's performance at those times, and display them in the graphs as “operating times” (counted in hours and days).

Do you have robots operating in many different time zones? Now you can input their locations to monitor them all in local time. This makes coordinating with on-site staff much easier.
Follow each robot's progress in its own time zone.
Every robot you connect on Insights can be tracked in its own time zone, which will be reflected in the data displayed on graphs, operating times and shifts, logs of events, and your daily, weekly, and monthly reports.
Article Prepared by Ollala Corp